Sl. No Name & address of employer, Place & country Principal features of the Project Contract price in INR Million Contract Period Major quantities
From To
1 Dy. Chief Engineer (Constn.), Southern Railway, Ernakulam Construction of Well & Pile Foundation for 933m long Railway bridge at Aroor in Kerala 43.74 Oct. 1980 Dec. 1982 Well sinking: 9,000 M3 Concrete:7,000 M3
2 Dy. Chief Engineer, (Constn.), Southern Railway, Madras Well foundation & Superstructure for Railway Bridge No. 167 across Kalinga river between Akkempet and Sullurpet Railway Stations, Madras 8 Jan.1985 Oct.1986 Well sinking: 5,800 M3 Concrete\;6,200 M3
3 Addl. Chief Engineer (C ), National Aluminum Company Ltd. Damanjodi, Orissa Inplant Bridges 17 & 17 A in Orissa 11.4 Nov.1984 Mar.1986 Earthwork: 60,000 M3Concrete : 7,000 M3
4 M.G.C.C., Bombay Design, engineering and construction of submersible skew bridge across river Kuhira Nalla at Nagothane, Bombay 5.5 Dec.1986 Nov.1988 Earthwork: 4,800 M3Con:2550 M3 Masonary : 2,125 M3 Reinfoce : 212MT Prestressed Girder:78 Each of length 48.5m
5 Dy. Chief Engineer(Constn.), Southern Railway, Ernakulam Construction of Precast, Pre-stressed segmental deck for major bridge across Vembanadu lake connecting Aroor & Kumbalam for new BG railway line in Kerala 28.87 Aug.1984 Apr.1989 39 Spans of PSC SuperstructureConcrete: 5,400 M3
6 Chief Engineer, Western Railway, Mumbai, India Construction of Superstructure consisting of prestressed concrete box girders of 48.5 mts X 110 spans for the bridge across 104.73 Jul-87 Jul-91 Length: 2750M Cement: 10,689.70 MT. Rein. Steel: 2,081.07 MT
7 Chief Engineer, Konkan Ralway Corporation Ltd, Karwar, Karnataka – 581306 Construction of major bridges across river Kali (42X30.5m PSC girder) consisting of RCC pile foundation, RCC mass concrete substructure, RCC piers and bed blocks, PSC girders with decking and other protective/ancillary works in Karwar 110 Apr.1991 Oct.1994 Con. Piles:182 nos. of length 4680 m-3675 M3 Con.in substr 2030 M3 Con. In girder 5250 M3
8 Chief Engineer, Konkan Ralway Corporation Ltd, Karwar, Karnataka – 581306 Construction of Roha – Mangalore new BG Railway line : Part – I – construction of 3 Nos. Road under Bridges at Kumta, Belse, Baleguli; Part – II – construction of Road over Bridges on NH-17 at Mirjan 17.28 Jan.1993 Dec.1994 Con. In found 2500 M3 Con. In substr 600 M3 Con. In girder 250
9 Chief Engineer, Konkan Ralway Corporation Ltd, Karwar, Karnataka – 581306 Major bridge across river Aghnashini, Gangavali and Kudrihalla (20x20m PSC girder and 4 x 10 m RCC slab respectively) consisting of RCC pile foundation, RCC piers and bed blocks, PSC girders with decking and RCC deck slab in super-structure and other protective/ ancillary works 55.2 Sep.1991 Dec.1995 Con. Piles 178Nos/3355m, 2617M3,Con. Substr. 3110M3 Con. In PSC girder 3,460 M3
10 Chief Engineer, Konkan Ralway Corporation Ltd, Karwar, Karnataka – 581306 Major bridges across rivers Belse, Baleguli, Hattikeri, Madanamadi and Amadalli Nallah (5 x 10 m RCC slab, 5 x 20m PSC girder, 6 x 10m RCC slab and 1 x 15 m RCC T beam and slab respectively) consisting of RCC open foundation, RCC substructure , PSC girder with dock slab, RCC T beam and RCC slab in superstructure and other protective/ancillary works 17.2 Oct.1991 Dec.1995 Con. Piles 70 Nos. /900 m,702 M3 Con. in found. 1700M3 Con. In substr. 1060 M3 Con. in superstr. 785M3
11 Chief Engineer, Konkan Ralway Corporation Ltd, Karwar, Karnataka – 581306 Construction of Mangalore – Roha new BG railway line – construction of two Road under Bridges of 1X38m PSC trough girder + 2x10m RCC slab for NH-17 crossing at Harwada and Amadalli 19.23 Jul-93 Nov.1995 EW Excvn. 2600 M3
Hard rock Excvn. 1000M3
Con. in found. 1810M3
Con. in Substr. 1782 M3
12 Northern RailwayKashmere Gate, New Delhi-6 Design and construction of new bridge(30 spans x29.455m) in replacement of existing Curzon bridge over Gaga river near Allhabad including double D well foundation of 6mx10.5 and RCC sub structure 169.3 Jun-90 May-96 Concrete well: 51,110M3
Well sinking: 69800M3
Con. substr. 7972M3
Con. in PSC girder: 7972 M3
13 Chief Engineer, Konkan Ralway Corporation Ltd, Panaji, Goa Construction of Roha – Mangalore new BG line proposed Road over bridge at KM 85/1-2 of Railway MG track for the crossing of Margao – Karwar NH- 17 road 39.4 Dec.1995 Jun-97 EW Excvn: 6085 M3
Con. 6410 M3
Pile Found – 750 RM
14 Superintending Engineer, PWD, Roads & Bridges, South Circle, Trivandrum Construction of new bridge at Ranny in the place of collapsed bridge across river Pamba at km.52/400 of Punalur – Muvattupuzha road 39.7 Mar. 1997 Jan.1999 128m long bridge with parts well foundation and partly open foundation and PSC superstructure
15 Chief Engineer (Construction), Southern Railway, Egmore, Chennai Design and construction of proposed new bridge No. 943 near Feroke in Kerala (7 spans X 30m) on proposed diverted alignment in lieu of the existing distressed bridge with pile foundation, RCC sub structure and PSC girder 35.22 Jun-95 Dec. 1999 Con. 3961 M
Piling : 40 Nos. of 1 m dia
Piles: 24 Nos. of 1.7 m dia special piles
16 Chief Engineer (Construction), Southern Railway, Egmore, Chennai Provision of superstructure with PSC girder for the second track for the work of doubling of track between Shoranur – Mangalore and Shoranur – Calicut section - reconstruction of bridge No. 943 with 7 spans of 30.4 m PSC girders at Feroke 20 Dec.1995 Sept.1999 Concrete: 900 M3
17 Supdtg. Engineer, National Highway, Central Circle, Thrissur Construction of Varapuzha Bridge and viaducts across river Periyar including approaches on NH-17 in Kerala 480 Jun-95 Dec.2000 EW: 1,80,043 M3
Con: 30,541 M3
PCC : 4121 M3
PSC:4690 M3
18 Supdtg. Engineer,National Highway (PW) Region, Konkan Bhawan,Navi Mumbai – 400 614 Construction of additional 2 lane Bassein Creek Bridge with approaches from km.496/00 to 497/00 of Mumbai – Ahmedabad (NH – 8) 514.3 Mar.1998 Sept.2001 EW: 30,500 M3
GSB: 1650 M3
Mastic Asphalt : 4140
Well sinking: 194561 RM
19 Dy. Chief Engineer (Con.), Northern Railway, Udhampur, J & K Construction of Twai Bridge for JURL Project in Udhampur 105.61 Feb.1997 Nov.2003 Excavation: 95551.11
Reinforce: 1550 MT
20 Roads & Bridges Development Corporation of Kerala Ltd., Preethi Buildings, Palarivattom, Kochi Design and construction of Road over Bridge at Nandi and Chengottukavu near Calicut in Kerala 117.56 Nov.2001 Aug.2005 Length : 392.615 m (Chengottukavu) 375.84m (Nandi) Sup. Str. 521.39 m (Cheng.)
21 Roads & Bridges Development Corporation of Kerala Ltd., Preethi Buildings, Palarivattom, Kochi Design and construction of Road over Bridge at Vengali & Vengalam near Calicut in Kerala 94.89 May-01 Jun-03 Length : 283.406 (Vengali)
285.05 m (Vengalam) EW:4834 M3
22 Executive EngineerKrishna Bhagya Jala Nigam Ltd., MLI Dn. Mattihal, Karnataka Construction of high level bridge across the river Krishna at Korti – Kolhar on SH-63 in Karnataka 388.2 Nov.2000 May-06 Length: 3000 m
RCCM30: 20145.17 M3
RCCM40: 16314.88 M3
23 National Highways Authority of India,G-5 & 6, Sector – 10,Dwaraka, New Delhi – 110 075 Widening to 4-/6 –lanes and strengthening of existing 2 – lane carriageway of NH-6 in West Bengal: major bridges between km.17.6 to km.136 (Dhankuni – Kharagpur) package No.WB-III 672.8 Jan.2001 Aug.2008 No. of bridges :9 Total length: 2264.723 m
Pile length: 9004.78 RM
Total well depth: 1033.25 RM
Con: 2765.907 + 17152.60 4 M3
Well sink: 1090.87 RM